Setting

Forgot Password

Language:
  • en
  • ru
  • fr
  • fr
Currency :

Water Coolers

Borg & Overstrom, Crystal Mountain, AA first and more.... Bottled, Plumbed in, Servicing, Parts and More....

Coffee Machines

N&W, Jura, Fraccino, Necta, Gaggia, Fraccino and more.... Bean to cup, Traditional, Servicing, Spares and more....

Boilers

Marco, Instanta, Berco, AA First, Bravilore, and more.... Parts, Spares, Servicing, Accessories and more....

Products

Nescafe, , Galaxy, PG Tips, Twinings, and more....

Showing 1-3 of 3 results

  • Spare Parts

    Spare Parts

    Bollin Valley are a one stop shop, are you looking for a spare part for your current machine?

    We hold stock of hundreds of spares and if we don’t have it in stock we can order it in for you!

     

    we keep stock of all major brands,

    • Instanta
    • Marco.
    • AA First
    • Burco

     

    Call the technical team our friendly engineers are more than happy to help! 0161 798 9600

    Add to compare Quick view
    Add to compare Quick view
  • Marco T10 EcoBoiler

    Marco T10 EcoBoiler

    Marco T10 energy efficient water boiler with a compact footprint. Plumbs directly into a mains supply. Excellent value for money. Easy to descale and service. Controlled electronically and made with 95% recyclable material.

    ELECTRICAL INSTALLATION PROCEDURE
    When installing the machine, always observe the local regulations and standards. The standard machine is supplied with a UK 3-pin plug. For EU models a 2-pin CEE-7 plug will be supplied. US models will be supplied with the suitable plug. A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install.

    PLUMBING INSTALLATION PROCEDURE
    • Ensure that the equipment is installed according to local plumbing & water regulations.
    • Mains water pressure required (limits): 14.5 – 145psi (100 – 1000kPa, 0.1 – 1MPa).
    • Requires inline water filter within your water specifications.
    • The machine is supplied with a 3/4“ BSP connection.
    • Connect straight tailpiece of the hose to the stop valve fitting. Make sure that the pre-attached sealing washer is fitted.
    • Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow several litres through, especially for new installations.

    Add to compare Quick view
    Add to compare Quick view
  • Marco T5 Eco boiler

    Marco T5 Eco boiler

    Marco T5 5Liter Eco Boiler

    ELECTRICAL INSTALLATION PROCEDURE
    When installing the machine, always observe the local regulations and standards. The standard machine is supplied with a UK 3-pin plug. For EU models a 2-pin CEE-7 plug will be supplied. US models will be supplied with the suitable plug. A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install.

    PLUMBING INSTALLATION PROCEDURE
    • Ensure that the equipment is installed according to local plumbing & water regulations.
    • Mains water pressure required (limits): 14.5 – 145psi (100 – 1000kPa, 0.1 – 1MPa).
    • Requires inline water filter within your water specifications.
    • The machine is supplied with a 3/4“ BSP connection.
    • Connect straight tailpiece of the hose to the stop valve fitting. Make sure that the pre-attached sealing washer is fitted.
    • Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow several litres through, especially for new installations.

    Keep your brewing running smoothly!

    Add to compare Quick view
    Add to compare Quick view

Showing 1-3 of 3 results