Setting

Forgot Password

Language:
  • en
  • ru
  • fr
  • fr
Currency :

Water Coolers

Borg & Overstrom, Crystal Mountain, AA first and more.... Bottled, Plumbed in, Servicing, Parts and More....

Coffee Machines

N&W, Jura, Fraccino, Necta, Gaggia, Fraccino and more.... Bean to cup, Traditional, Servicing, Spares and more....

Boilers

Marco, Instanta, Berco, AA First, Bravilore, and more.... Parts, Spares, Servicing, Accessories and more....

Products

Nescafe, , Galaxy, PG Tips, Twinings, and more....

Marco T10 EcoBoiler

Marco T10 energy efficient water boiler with a compact footprint. Plumbs directly into a mains supply. Excellent value for money. Easy to descale and service. Controlled electronically and made with 95% recyclable material.

ELECTRICAL INSTALLATION PROCEDURE
When installing the machine, always observe the local regulations and standards. The standard machine is supplied with a UK 3-pin plug. For EU models a 2-pin CEE-7 plug will be supplied. US models will be supplied with the suitable plug. A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install.

PLUMBING INSTALLATION PROCEDURE
• Ensure that the equipment is installed according to local plumbing & water regulations.
• Mains water pressure required (limits): 14.5 – 145psi (100 – 1000kPa, 0.1 – 1MPa).
• Requires inline water filter within your water specifications.
• The machine is supplied with a 3/4“ BSP connection.
• Connect straight tailpiece of the hose to the stop valve fitting. Make sure that the pre-attached sealing washer is fitted.
• Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow several litres through, especially for new installations.

Add to compare
Compare

Description

ELECTRICAL INSTALLATION PROCEDURE
When installing the machine, always observe the local regulations and standards. The standard machine is supplied with a UK 3-pin plug. For EU models a 2-pin CEE-7 plug will be supplied. US models will be supplied with the suitable plug. A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install.

PLUMBING INSTALLATION PROCEDURE
• Ensure that the equipment is installed according to local plumbing & water regulations.
• Mains water pressure required (limits): 14.5 – 145psi (100 – 1000kPa, 0.1 – 1MPa).
• Requires inline water filter within your water specifications.
• The machine is supplied with a 3/4“ BSP connection.
• Connect straight tailpiece of the hose to the stop valve fitting. Make sure that the pre-attached sealing washer is fitted.
• Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow several litres through, especially for new installations.

 

Model            Power            Heat-up            Recovery            Stand-by            Hourly             Rapid               Hourly
Loading         Time                 Rate                     Power                Draw off           Output            Output
(kW)              (Mins)              (liters)                 (kw/h)                (Cups)*            (Liters)            (Cups)*

T10EB              2.8                   20                     0.5                        0.1                                                 28                        185

Additional information

Weight 12.5 kg
Dimensions 463 × 210 × 590 mm

Select at least 2 products
to compare