Marco T10 energy efficient water boiler with a compact footprint. Plumbs directly into a mains supply. Excellent value for money. Easy to descale and service. Controlled electronically and made with 95% recyclable material.
ELECTRICAL INSTALLATION PROCEDURE
When installing the machine, always observe the local regulations and standards. The standard machine is supplied with a UK 3-pin plug. For EU models a 2-pin CEE-7 plug will be supplied. US models will be supplied with the suitable plug. A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install.
PLUMBING INSTALLATION PROCEDURE
• Ensure that the equipment is installed according to local plumbing & water regulations.
• Mains water pressure required (limits): 14.5 – 145psi (100 – 1000kPa, 0.1 – 1MPa).
• Requires inline water filter within your water specifications.
• The machine is supplied with a 3/4“ BSP connection.
• Connect straight tailpiece of the hose to the stop valve fitting. Make sure that the pre-attached sealing washer is fitted.
• Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow several litres through, especially for new installations.
ELECTRICAL INSTALLATION PROCEDURE
When installing the machine, always observe the local regulations and standards. The standard machine is supplied with a UK 3-pin plug. For EU models a 2-pin CEE-7 plug will be supplied. US models will be supplied with the suitable plug. A suitable mains power supply socket should be available within easy access of the appliance so that it can be disconnected easily after install.
PLUMBING INSTALLATION PROCEDURE
• Ensure that the equipment is installed according to local plumbing & water regulations.
• Mains water pressure required (limits): 14.5 – 145psi (100 – 1000kPa, 0.1 – 1MPa).
• Requires inline water filter within your water specifications.
• The machine is supplied with a 3/4“ BSP connection.
• Connect straight tailpiece of the hose to the stop valve fitting. Make sure that the pre-attached sealing washer is fitted.
• Turn on the water to flush any impurities, dust etc from the inlet hose and water pipe. Allow several litres through, especially for new installations.
Model Power Heat-up Recovery Stand-by Hourly Rapid Hourly
Loading Time Rate Power Draw off Output Output
(kW) (Mins) (liters) (kw/h) (Cups)* (Liters) (Cups)*
T10EB 2.8 20 0.5 0.1 28 185
| Weight | 12.5 kg |
|---|---|
| Dimensions | 463 × 210 × 590 mm |
Monthly Offers Straight to your inbox.
Bollin Valley are a family run company that have been in business since 1998, providing companies across the UK with the one stop coffee and water solution. Based in Manchester, we strive to offer the best customer focused service in the industry, our helpful an chatty staff are willing to assist in any way possible and our drivers are happy to help there is no task to big!.
Select at least 2 products
to compare